Delivery Date: 2-3 Month
Visitors : 3104People
Pallet blow molding machine used to produce different size pallet,because the standard of every country is different ,so the YanKang company can use private customized methods according to customers’s different design requirements .in order to ensure this kinds of blow molding machine are better adapted to the market, with modular design make the blow molding machine to easy install,adopt the servo pump and induction heaters ,more energy efficient .super high cost performance characteristics make our blow molding machine have broad market prospects,make our blow molding machine more diversified
Pallet Blow Molding Machine Introduction:
1.Adopt Siemens PLC,Siemens Touch Screen and MOOG to make the blow molding machine to operate easy,more intelligent.
2.Adopt progressive hydraulic system by ourselves,easy to control.
3.Adopt servo motor to control the hydraulic system,saving a lot of energy.
4.The technology of Die Head is same with Germany.
5.Adopt new integrated Multi-layers die head design.from one layer to six layers,support for productions of pallets and road barriers at same time.
Pallet Blow Molding Machine Features:
Full set of original SEIMENS control system to ensure the high-quality,safe and stable operation ,with international service after sale at same time
Using the American MOOG wall thickness controller to ensure the wall thickness more uniform and precise
The customers can choose the die head design from one layer to six layers for the pallet blow molding machine
We can design the molds according to size of road barrier at same time,and then design the clamping platen unit ,the extruder system,hydraulic system and so on.
Pallet Blow Molding Machine Configuration:
Pallet Blow Molding Machine Productions Show:
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.
GUARANTEE
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.